AZN747

 找回密码
 立即注册
搜索
查看: 1186|回复: 1

Transportation improvements on DVP, when?

[复制链接]
发表于 2017-9-8 06:34:07 | 显示全部楼层 |阅读模式
From the East, Kingston Rd was probably planned to have an Alternate route to the Downtown area.

The Eastern part of Gardiner elevated roadway was probably made to get ready for the leg.
Nothing is happening for a long time.

In the mean time DVP is WAY OVER CAPACITY and commuters are wasting their time and getting frustrated.

Possible solutions:

1. Make Elevated or Speedy route on Kinsgston rd to DT.
2. Restricted trucks on DVP during rush hour (Think it has more impact on 401 rather than DVP)
3.  Elevated Express highway with moving directions catering to the rush hour traffic, ie. Day to DT, night from DT, all one way, say 3 lanes.  EXPRESS ONLY from 401 to Bloor .

Someone in DVP management please try to DO SOMETHING,  doing NOTHING is not an option.
回复

使用道具 举报

发表于 2017-9-8 14:14:23 | 显示全部楼层
When?  

When Asian workers are doing the construction!

If it wasn't built by Chinese workers who started from the West, the Trans-Canada is still being built, and probably just reached the west side of the Canadian Rockies!

回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

AZN747

GMT-5, 2024-3-28 05:00 , Processed in 0.032731 second(s), 13 queries .

Powered by Discuz! X3.4

Copyright © 2001-2021, Tencent Cloud.

快速回复 返回顶部 返回列表